Phase I
Page 3
The existing inspection hatches will be turned into roof lights, and further rooflights may be added to maximise the use of natural light. The roof will be screeded to create a better fall for drainage, and, when funds permit may be seeded. This picture shows the roof exposed.
This picture illustrates the “pyramid” construction of the walls.
Views of the front to the Southwest and Southeast. Creating vehicle access around the site, avoiding water main!
Well, we knew it was a funny shape !

Although lower than the ‘new’ building, the hatches and vent pipes on the ‘gothic’ tank are raised to the same height, and now exposed give this sinister appearance.

We’ve created a vehicle access track around both tanks and will now concentrate on the site frontage and entrance.